BUILDING MATERIAL CATEGORY

Tiles & Stone

Compare surface, format, finish, shade range and packing requirements before ordering. For project quantities, calculate waste allowance and keep batch consistency in mind.

Tiles & Stone

PROJECT FIT & APPLICATION

Coordinated around architectural drawings and job-site requirements.

Share your room schedules, floor plans, or BOQ before quotation. Providing context early prevents mismatched specifications, ensures accurate hardware tolerances, and speeds up the quotation timeline.

Send Drawings for Review

TARGET APPLICATIONS

Common Project Fit

  • Hotels
  • Villas
  • Apartments
  • Commercial interiors

SUPPLY CAPABILITIES

Coordination Scope

  • Porcelain and ceramic tile sourcing
  • Stone and slab sourcing
  • Finish coordination
  • Project quantity planning
  • Mixed material consolidation

MANUFACTURING & SPECIFICATION GUIDE

Procurement Parameters & Standards

Verified supply parameters for Tiles & Stone based on George Group's Foshan manufacturing operations and audited partner network.

Customization ScopeCustom dimensions, CAD shop drawings, finish selection, material composition, and hardware configuration according to architectural drawings.
Quality & Environmental StandardsE1 emission classification, EN 717-1 formaldehyde testing, CARB standards where applicable, with full SGS inspection and testing support.
MOQ PolicyFlexible and project-based. Low MOQ options available for project packages. Quotation confirmed based on total material scope.
Sample & Mockup PolicyMaterial samples, finish swatches, color references, and door/hardware samples available for physical confirmation prior to mass production.
Quality Inspection (QC)100% pre-shipment inspection covering dimensions, finishes, assembly tolerances, hardware pre-fitting, export crating, and high-res client reports.
Warranty CoverageStandard product warranties typically range from 2 to 5 years depending on product category, material specification, and contract terms.
Quotation TurnaroundInitial quotation and material schedule normally provided within 24 hours after receiving sufficient drawings, BOQ, or room dimensions.

BEFORE QUOTATION

Checklist: Details to confirm before production.

Missing specifications create unnecessary revisions or job-site installation delays. Use this category checklist when submitting your inquiry.

  • Application area
  • Tile/slab size
  • Surface finish
  • Color/shade tolerance
  • Slip/performance requirements
  • Quantity and waste allowance

START WITH YOUR PROJECT SCOPE

Send drawings, a BOQ or a product list.

We can structure the material scope and identify the specifications needed for a useful quotation.

Request Project Quote