BUILDING MATERIAL CATEGORY
Doors & Windows
Door and window quotations depend on more than width and height. Define opening dimensions, frame system, glazing, hardware, finish and project performance requirements before production.

PROJECT FIT & APPLICATION
Coordinated around architectural drawings and job-site requirements.
Share your room schedules, floor plans, or BOQ before quotation. Providing context early prevents mismatched specifications, ensures accurate hardware tolerances, and speeds up the quotation timeline.
TARGET APPLICATIONS
Common Project Fit
- Residential projects
- Hotels and resorts
- Apartment buildings
- Commercial fit-outs
SUPPLY CAPABILITIES
Coordination Scope
- Interior and exterior doors
- Window systems
- Frame/finish options
- Glass and hardware coordination
- Drawing-based sizes
MANUFACTURING & SPECIFICATION GUIDE
Procurement Parameters & Standards
Verified supply parameters for Doors & Windows based on George Group's Foshan manufacturing operations and audited partner network.
| Customization Scope | Custom dimensions, CAD shop drawings, finish selection, material composition, and hardware configuration according to architectural drawings. |
|---|---|
| Quality & Environmental Standards | E1 emission classification, EN 717-1 formaldehyde testing, CARB standards where applicable, with full SGS inspection and testing support. |
| MOQ Policy | Flexible and project-based. Low MOQ options available for project packages. Quotation confirmed based on total material scope. |
| Sample & Mockup Policy | Material samples, finish swatches, color references, and door/hardware samples available for physical confirmation prior to mass production. |
| Quality Inspection (QC) | 100% pre-shipment inspection covering dimensions, finishes, assembly tolerances, hardware pre-fitting, export crating, and high-res client reports. |
| Warranty Coverage | Standard product warranties typically range from 2 to 5 years depending on product category, material specification, and contract terms. |
| Quotation Turnaround | Initial quotation and material schedule normally provided within 24 hours after receiving sufficient drawings, BOQ, or room dimensions. |
BEFORE QUOTATION
Checklist: Details to confirm before production.
Missing specifications create unnecessary revisions or job-site installation delays. Use this category checklist when submitting your inquiry.
- Rough opening / finished opening
- Opening direction
- Frame profile
- Glass configuration
- Hardware
- Finish
- Local performance/code requirements
RELATED CATEGORIES
Coordinate Doors & Windows with other materials.
Consolidate multiple categories into one container shipment to reduce freight costs and eliminate multi-vendor coordination hassles.

Kitchen Cabinets & Wardrobes
Custom cabinetry packages for residential, apartment and hospitality projects.

Tiles & Stone
Floor, wall and stone material sourcing for coordinated interior and exterior finishes.

Bathroom & Sanitary Ware
Bathroom product packages coordinated by room type, finish family and installation requirements.

Lighting & Electrical
Decorative and project lighting coordination around design intent, voltage and installation needs.
START WITH YOUR PROJECT SCOPE
Send drawings, a BOQ or a product list.
We can structure the material scope and identify the specifications needed for a useful quotation.